« 00053 · Edit Form · 00055 »
Summary: It should be possible to enter in the field Budget: no comment/UNSPECIFIED
Type: Entry fields
Priority (1<5) = 4
Status: Closed
Raised by: Florian Ackermann?
Project: CORE Organic
Related to
Date opened: 2005–10–07
Assigned to Hugo
Hours used (estimates in brackets) = 1
Date closed: 2009–09–08
Description:
If a projektleader dont want to advise something about his budget you have to enter a “0″, but this is not correct. So it should be also possible to write: no comment/UNSPECIFIED Keine Eingabe (Angabe) in the field budget.
Otherwise it look like the projekt has no budget, and a few projektleader from here dont want this.
Thanks,
Florian
SOLVED: Budget is no longer required for projects and only displayed if specified.